Eccentricity has been involved with a client at Wacol QLD installing 2 new ABB Safelink2 RMU's. Works included cable terminations to a new metering unit and new 1000kVA transformer. Testing and Commissioning of the RMU, Transformer and associated cabling was performed to ready the works for energisation.
https://www.high-endrolex.com/16